Tomorrow, works on the Pancevo bridge, this is how the traffic will develop



[ad_1]

At the Pancevo bridge tomorrow from 9 am to 5 pm, traffic will take place in the left lane, heading towards Belgrade, due to works in the right lane heading towards Pancevo-Belgrade, Roads of Serbia announced today.

On the Pancevo bridge, scraping and asphalt works are being carried out on the damaged asphalt curtain as part of the preparatory works for the repair of expansion joints.

On the Surčin-Ostružnica loop, until 7 December this year, from 8 a.m. to 4 p.m., road rehabilitation works will be carried out on the right lane of the bridge over the Sava.

During the works, traffic from the direction of Novi Sad to Belgrade was redirected to the newly constructed part of the bridge, in the opposite direction, the direction from Belgrade to Novi Sad.

On the road in the direction of Belgrade to Nis, the “Transped” loop – the “Mali Pozarevac” loop, until November 11, from 7 am to 5 pm, works will be carried out on the installation of covers in drains and sewer pits pluvial.

The far left overpass traffic lane is closed to traffic.

Traffic in the work zone will take place in the middle lane and the rightmost stop lane.

On the Boljevci – Obrenovac stretch, traffic was suspended until December 29 due to road repair works.

The alternative road from the direction of Obrenovac is the highway Miloš Veliki, and from the direction of Boljevac there is no alternative road.

The roads of Serbia recommend maximum caution when driving and urge traffic participants to adjust their speed due to the appearance of fog that reduces visibility on the roads, especially in the sections that run along rivers, valleys, gorges and road facilities across rivers.

There are no vehicle stops at toll stations on Serbian roads.

According to the latest information from the Border Police Administration, at the Horgos border crossing, at the exit, the delay for cargo motor vehicles is 90 minutes.

At the Batrovci border crossing, on departure, the delay for freight motor vehicles is 120 minutes, while at other border crossings there are no delays.



[ad_2]