[ad_1]
The old Sava bridge will be dismantled and temporarily placed on a plot in the municipality of Palilula, Belgrade urban planning chief Marko Stojčić said.
“Dismantling work will probably begin next year, while a new bridge will be built in its place. The old bridge will be cut into three parts, transported by boat to its temporary location, so that it can be used again later,” He said. Stojcic for “Blic”.
The newspaper recalled that after citizens testified, the City made the decision to move the Old Sava Bridge to Ušće Park and have cafes and restaurants within it.
Stojcic said the New Sava Bridge will have two lanes in each direction, with a tram “garden” in the middle and a bike path. “It will be a new bridge that should start building next year, we don’t know exactly when because the corona virus has slowed everything down a lot,” Stojcic added, and it is expected to be finished in 2022.
The second option, which received fewer votes, was to move the Old Sava Bridge between Ada Ciganlija and the New Belgrade blocks, and later it was decided to build a pedestrian-bicycle bridge connecting Ada with Block 70.
[ad_2]