[ad_1]
Belgrade: The old Sava bridge will be dismantled and temporarily placed on a plot in the municipality of Palilula, said Belgrade’s chief urban planner Marko Stoji.
Source: Beta, Blic.rs
Photo: D. Bali, B92.net
“Dismantling work is likely to begin next year, while at the same time a new bridge will be built in its place. The old bridge will be cut into three parts, transported by boat to its temporary location, so that it can be used. again later, “he said. Represents the “Blic” of today.
The newspaper recalled that after the statements of the citizens, the city made the decision to move the Old Sava Bridge to the Ue Park and have cafes and restaurants within it.
Stoji indicated that the New Sava Bridge will have two lanes in each direction, with a “batik” tram in the middle and a cycle path.
“It will be a new bridge that should start construction next year, we don’t know exactly when because the coronavirus has slowed down a lot,” Stoji added, and it is expected to be completed in 2022.
The second option, which received fewer votes, was to relocate the Old Sava Bridge between Ada Ciganlija and the New Belgrade blocks, and later it was decided to build a pedestrian-bicycle bridge connecting Ada and Block 70.
[ad_2]