[ad_1]
Belgrade – Belgrade Deputy Mayor Goran Vesi stated that preparatory work for the construction of a fountain on the plateau near Cvetni trg has started these days.
Source: B92
Photo: Beoinfo
He also claimed that the construction itself will last until the end of February, depending on weather conditions, reports Beoinfo.
“The fountain will have an area of forty square meters and will consist of two parts. One is a plateau with vertical jets that you can pass between, and the other consists of stone buckets and five small pools of different sizes with shallow water. The font is designed. as an overflow, and the nozzles will be in three rows with six, five and four nozzles to be placed alternately. The operating mode provides for the possibility of adjusting the height of the jets from 30 to 120 centimeters ”, Vesi specified.
He especially highlighted that this unique fountain will be located exclusively in the concrete part of Cvetni trg.
“This is very important because that way the trees and the existing green area will not be endangered,” said the deputy mayor.
He stated that the investor is the city of Belgrade, that is, the Secretariat for Community Affairs and Housing, and the donor is the company “Vodavoda” doo Mionica.
[ad_2]