[ad_1]
Moldova, which has no motorway, occupies a special place in the PNL offer, with 660 km of motorway out of a total of 970 planned nationwide, but also with several expressways and belts of some cities. However, it falls into the area of interest of liberals and other regions. Below are the promises of NLP, as they appear in the Government Program.
Finished 970 km of roads and express roads in the period 2021-2024 of which:
660 km of motorway: 320 km of the A7 motorway, Ploiești-Buzău-Focșani-Bacău-Pașcani;
160 km from the Transilvania highway;
43 km of the Pitești-Sibiu highway (section 1 Sibiu-Boița and section 5 Curtea de Argeș-Pitești);
100 km from Bucharest highway (south and north), 24 km from Sebeș-Turda Lot 2 highway;
14 km from the Lugoj-Deva Lot 2 Highway;
310 Km motorway: 121 Km from the Craiova-Pitești motorway;
13 km Brăila-Galați Express Road, 100 km Buzău-Brăila Express Road;
75 km Focșani-Brăila Express Drum. We completed the suspension bridge over the Danube from Brăila and the connecting roads.
We are starting new investment projects in Moldova, Dobrogea and the South Region, of which: A8 Highway, Târgu Mureș-Târgu Neamț-Iași-Ungheni – approx. 311 km; Highway A7, Pașcani-Suceava-Siret –80 km; Highway A13, Brașov-Bacău – 160 km
Highway A13, Sibiu-Brașov – 125 km;
Express routes in the Dobrogea area: Brăila-Tulcea-Constanța; Tișița-Albița highway – 347 km;
Ploiești-Găești highway – 74 km; Bacău-Piatra-Neamț highway – 61 km;
Timișoara-Moravița expressway – 60 km;
The fast track Dr. Tr. Severin-Caransebeș-Lugoj (142 km) to which is added the cross-border corridor Dr. Tr. Severin-Calafat (72 km), part of the connectivity corridor of the projects analyzed within the 3 Seas Initiative. We started the works in: Autostrada Nordului; Ploiești-Comarnic-Brașov highway;
Sections 2, 3 and 4 of the Sibiu – Pitești highway.
[ad_2]