[ad_1]
The project has reached the city municipality, which presents the intention to implement the project of a new housing block on the plot between Mozūriškių street and Buivydiškės pond. The quarter would consist of 24 two- or three-story residential buildings with various apartments. It is planned to install 180 apartments in the neighborhood. The area of the developed territory is 2.5 ha.
The builder of the project is the real estate REWO.
When planning the development of this territory, REWO continues with the construction of a new housing concept started in Lithuania a few years ago, when each apartment has a separate entrance from the outside, a private courtyard and functional planning. These apartments meet the expectations of people who want to live in their own home and be surrounded by nature.
“We were the first to bring such a housing concept to the market, which is very popular in English and American cities. We have already built similar projects in this area in Vilnius – New England, Town House and Nok Nok Home. They had a lot of Success. Feeling the need for compact, rational and realistic housing in the city, we are creating another similar project “, said Edvinas Malevskis, director of REWO.
According to the developer, the apartments in this place must be affordable and attractive for young people who buy their first home, want to live closer to nature and have good connections to the city center. Here in the neighborhood you will have a forest, Buivydiškės ponds, the Western Bypass and the Vilnius Outlet outlet center.
The company plans to obtain a building permit next summer. It is planned to invest LTL 13.3 million in modern architecture, energy class A + houses and landscaped territory. EUR. The developers expect the project to be completed in two years.
Three types of apartment buildings will be built in the quarter.
Write a. Residential homes with three, four and six two-story apartments. Each apartment has two floors 58 m2 Common area with two bedrooms. The apartments are designed with individual entrances from the outside.
Type B. Homes with six floors and two floors. Each apartment has two floors and 72 m2 Common area with three bedrooms. The apartments are designed with individual entrances from the outside.
Type C. Three-story residential house with two or four apartments on each floor. The planned apartments will be from 25 to 78 m2 zone. Each apartment has a balcony
Project technical parameters
- Address of the planned object – Mazūriškių st. 182, Justiniškės;
- The area of the plot is 24,300 m2;
- The total area of the buildings is 9,708.26 m2;
- Building height: up to 3 floors (up to 11 m high);
- Energy efficiency class of buildings: up to A +;
- Number of apartments – 180 units:
- Places to store bicycles: 36 units;
- Number of parking spaces – 204 units. (above ground parking);
- The vegetation area is 9,560 m2 (39% of the plot area);
- Project developer – UAB Manreta;
- Project proposals were prepared by UAB Arch-1, project manager – Antanas Pikalovas.
Public deliberation
The public can send their proposals by email before January 18. [email protected] The public hearing of project proposals will take place on January 18, at 5 in the afternoon, by remote video transmission. Link to the video stream here.