[ad_1]
The project proposals state that an arched wooden bridge will be built, which will consist of two interlocking elements, connecting the banks at four points, the lower and upper docking terraces, thus ensuring maximum comfortable movement of people.
Construction scheme: arched, with the rolling part at the top. It is envisaged that the main load-bearing structures of the bridge will be made of glued wood elements that are extremely light, natural and, at the same time, innovative and durable. The arched structure of the bridge connects the shores of the lower terrace and supports the upper walkway. The bridge supports are provided in monolithic reinforced concrete, supported on drilled piles. The reinforced concrete supporting part of the arched structure is installed above the foreseen water level of the glacier, so that the wooden structure and the flexible metal support pieces are protected from the direct impact of the glacier ”,
Project technical parameters
- The direction of the planned object is the Pedestrian Bridge over the River Neris, by A. Goštauto str. to Upės street;
- Bridge length – 112 m;
- Bridge width – 14 m;
- Project Developer – Vilnius City Municipality Administration;
- The project proposals were prepared by UAB INHUS Engineering, Project Manager – Justas Petkevičius.
Public deliberation
Representatives of the public can send their proposals by e-mail [email protected] until 6 October at 4:00 p.m. The public hearing of the project proposals will be held on October 6, 05.05, by remote video transmission. A link to the video stream is provided here.
[ad_2]