[ad_1]
Traffic interruption of all vehicles on the Acheloos Bridge in Stratos (kilometer position 77 + 200) from E.O. Antirriou-Ioannina will be valid from May 4 to 7, 2020 and during the hours of 06:30 to 19:00.
Traffic regulations are foreseen for the execution of asphalt works, while the traffic will be carried out through the Halkiopoulou – Stratou provincial highway, the Matsoukiou bridge and the Kalyvia – Spolaita bridge highway.
During the previous period of time, under the responsibility of the contractor company of the “ODOS SA” project, all appropriate measures will be taken for the uninterrupted and safe conduct of pedestrian and vehicle traffic. In addition, that provided by K.O.K. Construction site marking, which will be valid 24 hours a day.
The decision is valid from 07:00 on May 4, 2020 and after its publication and ends at 19:00 on 07/05/2020.
[ad_2]