[ad_1]
At least 70 percent of waste on construction sites must be reused or recycled, the EU requires.
One container for plaster, one for hazardous waste, one for plastic, one for pallets, one for glass and windows, one for hard materials like concrete and bricks, one for electrical waste, one for dirty waste. Also, one for wood. All marked in Norwegian, English and Polish.
At the JM construction site in Sinsen in Oslo, the waste is sorted. In total, more than 1000 apartments are being built along the metro between Storo and Sinsen.
Read the full case with subscription