In the Pilaitė district of the capital, 3-4 million Group value in EUR Business



[ad_1]

Project proposals published on the Vilnius City Municipality website indicate that the pool building is being designed by order of the Pilaitė Gymnasium. Designers: “Project Development Center” and “Exact Form”.

Pool near the school

35.3 thousand kv. m on the plot, where there is a gym, it should rise about 4.6 thousand. kv. Area m, one-story building with basement and mezzanine.

“The plot has a gym building and a covered sports field with changing rooms in container buildings. <...> The part of the plot where the sports building is projected – the swimming pool is in the western part of the gymnasium territory, on the site of the existing asphalt sites ”, the project proposals indicate.

It should host 200 visitors and a 63-car parking lot is planned next to the building.

“Project Development Center” and “Exact Shape” / A new swimming pool is planned in Pilaitė

The document states that the A ++ energy class building is designed in parallel to Tolminkiemio street.

“The central part of the projected building consists of the entrance to the building, the dressing room and dressing room-shower area. A billiard room is being designed in the southern part of the building, which houses a 25m 6-lane lap pool and a relaxation area with a children’s pool, Jacuzzi and saunas.

In the northern part of the building, the designed gyms are designed for boxing, wrestling, and group activities. A separate block is designed for the installation of the administration and training facilities ”, state the project proposals.

“Project Development Center” and “Exact Shape” / A new swimming pool is planned in Pilaitė

It would emerge after 2-3 years.

Vilnius Deputy Mayor Valdas Benkunskas 15 minutes He said that according to the municipality’s calculations, there are still 4-5 basins in the capital, in addition to Fabijoniškės and Lazdynai under construction. Both are necessary to meet the needs of children’s sports and adult leisure employment.

“It is planned to build a 25-meter 6-lane swimming pool on the Pilaitė Gym territory, where there is a vacant lot. The pool would be for a large community of almost 30,000 people. The Pilaitė district, which has a population, ”he said.

Valdo Kopūstas / 15min photo / Valdas Benkunskas

Valdo Kopūstas / 15min photo / Valdas Benkunskas

According to V. Benkunskas, the swimming pool would serve mainly for the education of children.

“We have a second-class swimming program that has received a lot of achievements and needs. Also, all the water sports of the Vilnius City Sports Center could be a place to practice and practice sports, water polo, modern pentathlon, triathlon And, of course, the Pilaitė community, ”he said.

According to the Vilnius deputy mayor, project proposals are currently being published.

“We will have a project in the near future and we are going to tender,” he said.

“Project Development Center” and “Exact Shape” / A new swimming pool is planned in Pilaitė

It is estimated that with all the infrastructure, this pool could be released from 3 to 4 million for the city. euros.

If construction of the facility does not take time, it is expected to open within 2-3 years.

Construction takes time

15 minutes recalls that two months ago, in early August, a football stadium covered by an inflatable dome was opened near the Pilaitė gym. True, it was scheduled to open as early as last fall, but the opening was delayed due to technical hurdles.

READ MORE: Promised last fall but only open now – a covered soccer field will finally open in Pilaitė

Those who wanted to visit the Fabijoniškės basin also had to wait for the opening. On December 31, 2018, on the eve of the New Year, the swimming pool was solemnly opened in Vilnius, although the time to bury the capsule was towards the end of March and later towards October.

“It is too late, but we finally have it,” Vilnius Mayor Remigijus Šimašius said during the opening ceremony.

READ MORE: Vilnius is saying hello: one of the most expensive swimming pools in Europe has opened

Meanwhile, according to the original plan, the Lazdynai basin was supposed to start operating as early as the summer of 2019, but amid construction, there was talk of delays for technical reasons. However, last October, one of the companies building the Vilnius Lazdynai basin, Active Construction Management (formerly Irdaiva), announced that it had filed for bankruptcy.

Valdas Kopūstas / 15min photo / Lazdynai multifunctional health center construction site tour

Valdas Kopūstas / 15min photo / Lazdynai multifunctional health center construction site tour

Currently, the Vilnius authorities have announced a new international tender: a contractor is being sought to complete the construction of a Lazdynai multifunctional health center in the capital. The former bankrupt contractor had made about 40 percent. All the work foreseen in the contract.

The newly selected contractor is expected to complete construction of the basin in a maximum period of 16 months.

READ MORE: Looking for a contractor to complete the construction of the Lazdynai Health Center in the capital



[ad_2]