Kaunas continues to return: spa and bike bridge to appear



[ad_1]

A sidewalk on both sides of this avenue is being rebuilt. According to the representative of the Municipal Administration of the City of Kaunas, Arnoldas Bukelis, new covers and curbs will be installed, modern lighting will be installed, which will serve not only cars and pedestrians, but will also illuminate the renovated Nemunas embankment. Instead of the old hedge, other green areas will be planted, so those who pass by can already see the picturesque section of the Nemunas that has been opened here.

Construction of a new bicycle and pedestrian bridge connecting Nemunas Island to King Mindaugas Avenue is also being intensified.

Firstly, the bridge will serve during the construction of the Museum of the Science Island and the Aquatic Sports Center: it will be able to move machinery and engineering networks will be built at the bottom. With the construction of the “Science Island” and the pool, with a significant increase in the flow of visitors, the bridge will serve cyclists and pedestrians, and if necessary, it will be used by special services.

ELTA has recently announced that the Municipality of the City of Kaunas has signed LTL 25.8 million with Conresta. A contract for the construction of a water sports center worth EUR. Work is scheduled to begin in early fall. Upon completion, a building of exceptional architecture will be erected next to the Žalgiris Arena, which will include not only an Olympic-size swimming pool with 500-seat grandstands, but also a spa area and sports club.

No part of this publication may be reproduced without the written permission of ELTA.



[ad_2]