[ad_1]
Source Title: Beijing-Chengdu Section of Beijing-Harbin High-Speed Railway Enters Operational Test
Yesterday (December 11) at 8:45 a.m., when the 55001 test train departed from Beijing Chaoyang Station, after a 51-day joint test, the Beijing-Chengde section of the Beijing-Harbin high-speed train began to enter the operation test, marking the opening. The countdown to operations. After the Beijing-Chengde section of the Beijing-Harbin high-speed train opens, the travel time from Beijing to Shenyang will be reduced to 2.5 hours.
The Beijing-Chengde section of the Beijing-Harbin high-speed railway is understood to be an important part of the “vertical” Beijing-Harbin-Beijing-Hong Kong-Macao channel of the “eight vertical and eight horizontal” national high-speed rail network . The line is 192 kilometers long and the design speed of the main line is 350 kilometers per hour. , The Chengshen section of the Beijing-Harbin high-speed railway was inaugurated on December 29, 2018. The Beijing-Chengde section of the Beijing-Harbin high-speed railway departs from the Beijing Chaoyang Station and passes through the Chaoyang District, Shunyi District , Changping District, Huairou District, Miyun District and enters Chengde City, Hebei Province.
The Beijing Youth Daily reporter learned that the test run of the Beijing-Chengde section of the Beijing-Harbin high-speed train is based on the completion of the entire line of the line, the signaling system of the line has conditions operating conditions and the driver can park in accordance with official operating standards. On the above, simulates the test of the formal opening operation scenario. The operation test uses 2 sets of EMUs to test the entire operation, the operation of each section and the train tracking interval to test the emergency handling capabilities in conditions of equipment failure, emergencies and natural disasters, and find and solve problems in railway construction, joint debugging Problems in the test and operation stages ensure that the conditions for safe operation are met. Yesterday’s test run was equipped with conductors, and train equipment and facilities were simultaneously checked during train operation.
It is understood that after the Beijing-Chengde section of the Beijing-Harbin high-speed train is open for operation, the operating time from Beijing to Shenyang will be reduced to 2.5 hours, which will form another high-speed rail channel in and out from the northeast region, which will help the coordinated development of Beijing-Tianjin-Hebei and the revitalization of the former northeast industrial base. Meaning.