[ad_1]
Original title: Direct impact on the site: The Bund ushered in 230,000 tourists on the eve of National Day, the largest instant flow of passengers exceeded 60,000
Dongfang.com reporters Li Huan and Liu Xiaojing reported on October 1: The Bund, South China SeaJingdongThe road area ushered in a greatPassenger flow. Reporters from Dongfang.com learned from the Bund Front Line Security Command that by 7:00 p.m., the Bund promenade had received more than 230,000 tourists, and the highest instant flow of passengers reached 65,000, which was twice the highest instantaneous passenger flow yesterday.
The weather was fine on the first day of the National Day holiday. Many citizens and tourists came to Nanjing Road and the Bund area for sightseeing, which is also one of the most popular attractions in Shanghai.
“Don’t worry, go slow! Don’t look at your phone.” Nanjing Road around 16 o’clockPedestrian streetThere was a growing crowd, and security forces, such as the civil police and the armed police, formed a human-shaped dividing line in the middle of the pedestrian street to guide the orderly flow of passengers. The reporter warned that most citizens and tourists can keep up the habit of wearing masks, and the delay will be made in accordance with the passenger flow control measures in place.
“Look, this is the Bund! That tower isPearl of the orient,You’ve seen? “On Zhongshan Road, while waiting for traffic control, Mr. Wei, a young man from Henan, opened the video on his mobile phone to show his family the view of the Bund. Mr. Wei was inShanghai goldMontanajobsI rarely go downtown. Heard there will be a light show on the Bund on National Day, so I went to the Bund with my wife to “come and go” for sightseeing.
In the eastern extension section of Nanjing Road pedestrian street, tourists cross the zebra crossing towards the Bund
At around 5 p.m., the passenger flow in the central Bund area began to increase significantly. The reporter learned from the Bund Front Line Security Command that at 6 p.m., the instantaneous flow of passengers from the Bund’s waterfront exceeded 60,000, and the instantaneous flow of passengers from the east extension section of the pedestrian street Nanjing Road was about 12,000. At the command center, the police are taking steps to limit the flow of passengers.
“As of 6:30, the embankment of the river 1-11 will not be able to descend and all the reinforcements will be on duty.” At approximately 6:15 p.m., Liu Haibo, director of the Bund security police station, looked at the big screen and dynamically adjusted the control measures. The first light and shadow show will start at 6.30pm. This will be a peak flow of passengers on the river embankment. “At this time, tourists on the river embankment will basically not go down. They have to wait to see the light and shadow show. Therefore, the ascending passage must be closed. Control the flow of passengers on the river embankment. Around 6:40, the first wave of people will come down and then open depending on the situation. “
The police on site to maintain order on the roads of the Bund are giving directions to tourists.
At 18:30 the first light show began. Tourists on the river embankment raised their mobile phones one after another, recording this radiant festive feast. At the command center under the river embankment, the police’s attention is focused on the passenger flow data that changes at any time. Based on experience, after the 5-minute light show is over, there will be a large number of passengers going up and down the river embankment.
“Attention everyone. After the light show is over, only ports 5, 6 and 7 cannot get off. The broadcast directions are broadcast to guide tourists along the river embankment.” Safe “.” Everybody! There is not much time left. “At 18:35, today’s first Pujiang light and shadow show ended. Several images of data on the big screen are constantly pulsing in real time. Regional heat, heatmap comparison, flow location, personnel migration, Liu Haibo radio station will not leave your hand and give instructions without interruption.
In the command room, more than 4,300 public security police, auxiliary police and academic police and other security forces are stationed in the southJingdongOn the road and the Bund area, measures such as dredging and interception, wave release and one-way traffic at the upper and lower entrances and exits and in the Bund seawall passages will be taken in time to avoid the danger of crowds and guide the orderly flow of passengers.
At 19:00, the instantaneous peak flow of passengers in the east extension section of Nanjing Road (Henan-Zhongshan) was nearly 25,000, and the cumulative flow of passengers was nearly 60,000; the Bund shoreline had the maximum instantaneous passenger flow of 65,000 and the cumulative flow of more than 230,000.
(Article source: Oriental Net)
(Responsible editor: DF522)
I solemnly declare: The purpose of this information disclosed by Oriental Fortune.com is to spread more information and has nothing to do with this booth.
[ad_2]