[ad_1]
Original title: The three main cultural buildings and shared support facilities in the Beijing sub-center to be completed in 2023
BeijingSub-center of the cityBig threecultureThe building and shared support facilities have fully entered the main structure construction stage. The structure is scheduled to close in the first half of 2021, the installation of the curtain wall will be completed by the end of 2021 and the interior decoration project will be completed by the end of 2022, to be completed and delivered in 2023.
This is the sub-center of Beijing cityBuildingadministrationOffice Director Wang Chengjun held a meeting on the 15thPress conferenceIntroduced above.
Theaters, libraries and museums are the three main cultural buildings in the city sub-center, located northwest of the “green city center”.planningAn important part of the pattern.
The theater, also known as “Cultural Barn”, is designed and built against the standards of world-class theaters and integrates the functions of performing arts, artistic creation, arts education and on-site experience. The theater is equipped with a theater, an opera house, a concert hall, a multi-functional hall, an open-air theater, etc., which can accommodate 5,550 audiences and will meet the requirements of various world-class performances in the future. At present, the construction of the theater is under intense construction, the pouring of the positive and negative zero ceiling of the first section has been completed, being the first to lift off the ground.
The library is also known as “Forest Book Garden”.Know howDiffusion, urban think tank, knowledge exchange and other functions are integrated. The construction area is about 75,000 square meters, the three floors above the ground are about 50,000 square meters, the subway is about 25,000 square meters, and the building height is 22.3 meters. Museum of tangible cultural heritage, open reading area, smart library,reportHall and other functionsDivide. At present, 95% of the cushion and waterproofing of the library are finished, the bottom plate and side walls are being poured simultaneously, and the first section of the basement ceiling is about to be poured.
The East Room of the Capital Museum, also known as “El Barco del Canal”, collectsStorage, Open exhibition, scientific research,societyEducation, literatureWarrantyComplex functions are built in, the south side resembles a tall sail; the north side resembles a solid and heavy ship, representing a canal image. The First Bodong Pavilion has a construction area of 97,000 square meters, with three floors above ground and two floors below ground. The height of the building is 35 meters. It is divided into two buildings, the main building and the public hall. At present, 70% of the cushion in the East Room of the First Botanical Garden is finished, and the waterproofing project is being promoted simultaneously.
(Source: China News Network)
(Responsible editor: DF524)
I solemnly declare: The purpose of this information disclosed by Oriental Fortune.com is to spread more information and has nothing to do with this booth.
[ad_2]