Traffic begins on a section of the South Arch of the Ring Road in Sofia – Society



[ad_1]

At 8:00 am tomorrow, December 6, to facilitate traffic in winter, traffic will begin on the direct route 1.7 km from the southern arc of the Sofia ring road, in the section between the “Mladost” and “Gorublyane”. the Road Infrastructure Agency.

The section is part of the reconstruction of 6 km of the ring road between k. Mladost and Trakia motorway. The goal is to make travel easier during the winter months and increase safety. The traffic begins with organization and temporary signaling and next year the works of the work will continue with the placement of the last layer of wear asphalt and the execution of all the finishing works.

490 machines worked the republican highways at night

At the beginning of November, the 2.5 kilometer section of the South Arc was put into operation again, from the connection with the Trakia motorway to the German highway junction, to facilitate movement with temporary traffic organization. Traffic on the section is three lanes for traffic in each direction, and at the “Lozen” road junction the local lanes are also used.



[ad_2]