The first quantities of gas arrived from Bulgaria to Serbia – 【World news】 • current information, topics and news



[ad_1]

The automation and control systems are currently being tested, the control stations, valves, optics and power supply are being inspected to see how the Bulgarian Stream will perform when the blue fuel arrives in Serbia on December 30, Novosti reported. “, Quoted by BGNES.

Thus, one of the most important projects will finally be launched, reinforcing the economic and geostrategic position of Serbia, the Serbian daily said. When gas officially passes through the Serbian main pipelines from Zajecar to Horgos, Serbia will practically consolidate its energy security and create the preconditions for the price of blue fuel to be more favorable to the economy and the population.

This will potentially increase the attractiveness of Bulgaria’s western neighbor for investors, leading to economic growth and industrial production. At first, most of the Russian gas will flow through pipelines, but in the future it will also be possible to supply it from other sources. The gas pipeline will be bi-directional, which means that Serbia will receive power from both Bulgaria and Hungary. “The pipelines of the interconnectors on the Bulgarian and Hungarian borders are filled with gas and a test is being carried out of all the systems necessary for the reliable and continuous operation of the gas pipeline, which is part of the internal gas transmission system of Serbia,” Dusan said to Novosti. Bayatovic, CEO of Srbijagaz.

He said that the gas pipeline, according to Serbian President Alexander Vucic, would be ready for operation on December 30 and that Serbia would receive gas from Bulgaria on January 1. The 403 km long Serbian highway gas pipeline runs from Zajecar to Horgos. Balkan Stream is actually a continuation of the Turkish Stream gas pipeline through Bulgaria. In official documents, it is called “the object of expansion of the gas transportation infrastructure of the company” Bulgartransgaz “in parallel with the main northern gas pipeline to the border between Bulgaria and Serbia”. The name “Balkan Stream” for the gas pipeline was proposed by Prime Minister Borissov. It was noted that the pipeline should be finished by December.


The “Turkish Current”, which launched on January 8, 2020, runs along the bottom of the Black Sea from Russia to the shores of Turkey. In addition, there is a part of land transit to the border with neighboring countries, from where gas is already exported to Greece, Bulgaria, Republic of Macedonia. Later, once the entire infrastructure is completed, the gas reaches Serbia and Hungary. The capacity of the 930 km pipeline is 31.5 billion cubic meters of gas per year. The United States has always spoken out against the Turkish current. Two days after the gas pipeline was put into service, on January 10, 2020, Washington sent a clear signal that they are against the extension of the gas pipeline through Bulgarian territory to the EU. The United States opposes the second line of the Turkish Stream gas pipeline to supply gas to Southeast Europe via Bulgaria as it sees it as a geostrategic project by Russia, said then-Under Secretary of State for Political Affairs David Hale.

Serbia



[ad_2]