[ad_1]
Borissov inspects the Sofia ring road staff: Facebook
Prime Minister Boyko Borissov inspected the capital’s ring road with his jeep. The tour started from the newly built bridge over Lozen. With him is the Minister of Economy, Lachezar Borisov.
“GDP is falling all over the world, in the US, the UK, the EU. The economies are taking huge damage. The network for the whole world is less than 10%. The worst news is that the COVID-19 patients in Europe have returned to March levels, there is no chance that the economy will pick up next year, “Borissov said.
We remind you that traffic on the Sofia ring road between Gorublyane and Mladost will be restored before 10 September.
“We have made the traffic so as not to close the entire section and have a traffic jam. This part has a new water supply, sewerage, lighting. The changes can be seen in 30 days,” Borissov said from the bridge to Lozen.
“In 2 minutes you will get from Mladost to Trakia. The bridge over Iskar is ready. They will see how the city will breathe after the bridge over Gorublyane is ready,” the prime minister said.
“The pace of construction is very fast,” said the Minister of Economy.
“LED lighting is being installed, everything must be illuminated. On September 7, traffic on the ring road between Mladost and Gorublyane will start in one part,” the prime minister said.
I want others to show me something they have done. I let people judge. The economic and financial measures are working, we are preparing a plan for the coming months, entering the crisis Bulgaria must be prepared. The most difficult year and a half is ahead. “We are managing the pandemic better in Europe. Our indicators remain the best,” he said.
Wait for details.
[ad_2]