[ad_1]
|
Has an accident on the way to the rescue.
On the afternoon of October 13, Major General Pham Van Ty, Deputy Chief of the Office of the National Committee for Incident and Disaster Response and Search and Rescue, and the Deputy Director of the Department of Rescue and Rescue (Ministry of Defense), confirmed the incident. Rao Trang 3 Hydroelectric Power Plant, Phong Xuan Commune, Phong Dien District, Thua Thien-Hue Province Consequently, at 12 noon on October 12, a resident telephoned directly Mr. Phan Thien Dinh, vice president of the People’s Committee of Thua Thien-Hue province, to announce that at 12 noon on October 11 there had been a mountain landslide, burying the house. Rao Trang 3 hydroelectric power plant operation. Upon receiving the information, the People’s Committee of Thua Thien-Hue province organized a mission of 21 people to the site to verify and find rescue plans.
The Rao Trang 3 hydroelectric plant is located upstream of the Bo River, approved by the People’s Committee of Thua Thien-Hue province in 2008, adjusted by the Ministry of Industry and Commerce in 2016. Consequently, this hydroelectric plant has a capacity 13 MW, when completed. the average annual electricity production is 44,343 million kWh. The investor of this corporation is Rao Trang 3 Hydropower Corporation, located in An Dong neighborhood, Hue city; built by Thanh Dat Joint Stock Company (with Ward An Dong). Together with the A Lin B1 and B2 hydroelectric plants on the A Lin River (HA Luoi), the Rao Trang 3 and 4 hydroelectric plants form a system as small capacity “terraced hydroelectric plants” in the system upstream of the Bo River. Between Rao Trang Hydroelectric Power Station 3 and 4, the distance is more than 10 km. |
At 14:00 on October 12, the group left the Phong Dien District Party Committee for Rao Trang 3 Battalion. At 4:00 pm on the same day, the group arrived underground, but the car was unable to pass. After that, the group left the car to walk to the Rao Trang 3 hydroelectric power station, about 13 km away. At 9:00 pm on the same day, the group arrived at subarea 67, Song Bo Ranger Station. At 22:00 on October 12, the group stopped at the ranger’s house, the building consists of 4 compartments including 3 bathrooms and 1 kitchen.
|
Efforts to find the person in danger
Just that day, the Defense Ministry ordered Military Zone 4 to coordinate with the Thua Thien-Hue Province People’s Committee to establish a rescue and rescue headquarters in Phong Xuan, H.Phong Dien communes; mobilized forces and means to overcome the landslide, clear the way to the area of the disappeared and the Rao Trang 3 Company. Military Region 4 and the People’s Committee of Thua Thien-Hue province presided over and coordinated with local forces . Search and rescue of missing persons in 2 areas of the Ranger house and the Rao Trang 3 hydroelectric power station.
Prime Minister asked to focus on rescueFaced with a serious natural disaster incident in the Rao Trang 3 area, the Prime Minister sent a telegram to the relevant units to focus on rescuing and overcoming the aftermath of the landslides in the area of the Ranger Station and the Rao hydroelectric power station. Luna 3. Consequently, the Prime Minister requested the Minister of National Defense, President of the National Committee for Response to Incidents and Disasters and Search and Rescue, Head of the Central Steering Committee for the Prevention and Control of Natural Disasters, Secretary, President of the Thua Thien-Hue Province People’s Committee, Military Region 4 Commander urgently focused on directing the necessary and adequate forces and means to organize the timely search and rescue of the buried victims; The forces involved in search and rescue must guarantee the absolute safety of people and means and promptly remedy the incident. The Ministry of Industry and Commerce, the Ministry of Agriculture and Rural Development and the People’s Committee of Thua Thien-Hue Province, in accordance with the state management functions, are assigned to direct the review and inspection of the safety guarantee for hydroelectric and irrigation dams, including projects. It is under construction, taking measures to guarantee the safety of the lives of people and property of the State and the people of the area.
On the afternoon of October 13, Vice Premier Trinh Dinh Dung, Minister of Agriculture and Rural Development, Permanent Deputy Head of the Central Steering Committee for the Prevention and Control of Natural Disasters, Nguyen Xuan Cuong, went to Phong Commune Xuan to check and understand the situation. . The Deputy Prime Minister held an urgent meeting with leaders of Military Region 4, Thua Thien-Hue province and related departments, through which important instructions on rescue work were given. |
On the afternoon of October 13, through radio waves, the Office of the Command for the Prevention and Search and Rescue of Natural Disasters (PCTT-TKCN) in the province of Thua Thien-Hue and the Hue coast station connected with the representative of the Rao Power Plant. Moon 4. Therefore, the bureau learned that there are 40 workers, including 3 Indian experts from the Rao Trang 3 hydroelectric plant construction site to find Rao Trang 4 safely after finding a landslide, missing Complete communication with the outside.
In this group of victims, there may have been someone calling to notify a member of the Provincial Information and Rescue Command, but the information was incomplete due to the loss of the telephone signal. Through the connection, the Office of the Provincial Fire Prevention and Control Command learned that the workers of the Rao Trang 4 hydroelectric power plant were safe, but isolated, the food was only consumed for a full day. Fortunately, on the same day, the rescue team was able to approach the Rao Trang 4 hydroelectric power station as mentioned above and provided the necessary supplies for the experts and workers here.
|
|
So far, authorities have temporarily identified a total of 30 missing persons, including 17 workers from Rao Trang Battalion 3 and 13 officers and soldiers who died while en route to the rescue.
On the night of October 13, despite heavy rains and extremely difficult access to the site, the search for people in distress was still carried out at the exercise level in the hope of minimizing damage.
|
[ad_2]