[ad_1]
Functional forces were mobilized to search for the body of Mr. H. – Photo: NHAT LINH
On the night of October 9, news from the Command for Natural Disaster Prevention and Search and Rescue of Thua Thien Hue Province said that competent forces found the body of Mr. Duong Phuong H. who was missing in the city of Phong Dien, Phong district. Filling.
Mr. H. was overturned while paddling with two friends to catch birds and snakes on the night of October 7. In addition to Mr. H., there were 4 flood injuries in the province.
According to the quick report, in Thua Thien Hue province, there are more than 2,400 houses flooded 0.2-0.5m, more than 442 households have to be relocated to avoid flooding.
Close-up of Huong Dien (Thua Thien Hue) hydroelectric power to regulate water discharge – Video: QUANG HA
Due to prolonged heavy rains, the province ordered the Huong Dien Hydroelectric Power Station to flood over spills and turbines with increasing flow, avoiding sudden changes with a flow of approximately 1800-2500m.3/ s.
Bo River flood forecast tonight will exceed alarm level III, Huong River flood will exceed alert II.
Faced with complicated flooding, Thua Thien Hue province gave students from across the province to drop out of school until the end of this week.
Functional forces moved boats to move people caught in the floods in Phong Thu commune, Phong Dien district, Thua Thien Hue – Photo: NHAT LINH
Due to heavy rains and landslides, the SE4 train from Ho Chi Minh City to Hanoi got stuck at Hue station, causing rail congestion for a long time.
On the night of 9-10, this train had to turn around and return to Da Nang station because it could not continue. Passengers who want to go to Quang Tri are transported by car on Highway 1.