Section of the first subway train union just landed in Ho Chi Minh City | Finance – Business



[ad_1]

At 8:00 am this morning (8:10 am), the first three carriages of subway line 1 (Ben Thanh – Suoi Tien route) arrived at Khanh Hoi port (District 1, Ho Chi Minh City) after 8 days of travel from Japan.
The section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 1

The Bayani vessels, of Philippine nationality, from a port in Japan transport 620 tons of equipment, including 75 bales, including 3 wagons from the No. 1 subway project

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 2

This ship was towed by a tugboat near the Phu My Bridge, which ran along the Long Tau River for almost 15 km to reach Khanh Hoi port.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh city - photo 3

Mr. Nguyen Quoc Hung, Deputy Director General of the Port of Saigon, said that all the preparation, loading and unloading of 3 wagons will be carried out in about 8 hours, and is expected to be delivered to the Urban Railway Project Management Board HCMC. (MAUR) today and tomorrow for Gemadept Logistics to transport the train to the Long Binh depot area (District 9).

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 4

Before 6 am, many port workers, a team of engineers and more than 10 Japanese experts were present at Khanh Hoi port to inspect and prepare for the decommissioning work.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 5

Images of wagons on deck, ready to be loaded and unloaded by specialized cranes

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 6
Section of the first union train department of the subway has just landed in the port of Ho Chi Minh city - photo 7

At 8 o’clock in the port, but more than 2 hours later, the first train of metro line 1 officially appeared.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 8
Section of the first union department of subway trains has just landed in the port of Ho Chi Minh city - photo 9

Close-up of the first subway train in Ho Chi Minh City.

Section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 10
Section of the first union department of subway trains has just landed in the port of Ho Chi Minh city - photo 11

The train is hopefully painted blue and consists of 3 wagons with a length of 61.5 m.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 12
Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 13

The maximum designed speed of metro line 1 is 110 km / h (aerial section), 80 km / h (tunnel section)

Section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 14

The 3-car train can carry a total of 930 passengers, of which 147 seats and 783 standing passengers.

Section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 15
The section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 16

Mr. Doan Van Tien, Project Director at Demadept Logistic Company, said that tomorrow night (October 9), the train is expected to start being transported from the port to the depot area in District 9. After After that, on the morning of October 10, the train will be loaded onto the rails and the systems will be ready for commissioning.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 17
Section of the first union department of subway trains has just landed in the port of Ho Chi Minh city - photo 18

About 30 engineers were present to load and unload the subway ship from the ship to the port.

Section of the first union department of subway trains has just landed in the port of Ho Chi Minh City - photo 19
Section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 20

According to the MAUR representative, the subway train will be tested in 3 phases: Phase 1 test in Binh Thai section – Long Binh depot (District 9); Phase 2 from Binh Thai Station to Van Thanh Station (District 2) and test run of the last stage from Van Thanh Station to Ben Thanh Station (District 1) in early 2021

Section of the first union train department of the subway has just landed in the port of Ho Chi Minh City - photo 21



[ad_2]