[ad_1]
According to Cuu Long Transport Infrastructure Development and Project Management Corporation (Cuu Long Corporation), this highway is part of the East North-South Highway, located in the Southern Key Economic Region (including City HCM, Dong Nai, Ba Ria – Vung Tau, Binh Duong, Binh Phuoc, Tay Ninh and Long An).
This region is one of the most dynamic economic development regions and makes the greatest contribution to the national economy. This area also focuses on road, sea and air traffic hubs, especially the Long Thanh International Airport (CHKQT) project in Long Thanh District, Dong Nai Province.
According to 2019 data, the average traffic at the beginning of this route (Long Phuoc – NH51) is 52,414 PCU / day and night (PCU is the converted car unit), on holidays, weekend, traffic is almost 57,000 PCU / day and night. In particular, the current scale of the highway can only cover about 44,000 UCP / day and night.
“From the above analytical bases, it can be seen that investment in the expansion of the Ho Chi Minh City – Long Thanh – Dau Giay highway is a very important and urgent task to meet the transportation needs. download and serve the socio-economic development of the entire southeast region in particular and the entire country in general ”- stated Cuu Long Corporation.
Therefore, Cuu Long Corporation proposes to the Ministry of Transportation to consider the plan to expand the scale from 8 lanes for the An Phu section to the Long Thanh intersection (with a length of 24 km), only the Long Thanh section – Dau Giay remains the same. current 4-lane model.
The 8-lane extension (twice as much as currently only 4 lanes) has the starting point (Km0 + 500) at the position behind the Ba Dat Bridge, in An Phu neighborhood, District 2, HCMC. The end point (Km24 + 558) is at the expected intersection with Bien Hoa – Vung Tau Expressway, in Long Thanh City, Long Thanh District, Dong Nai Province.
Extension length: 24 km. Expansion scale: the An Phu – Ring 2 section (Km0 + 500 – Km4 + 514) stretches 5.25 m on each side to reach a size of 8 lanes, bed width of 36 m (excluding single lanes).
The total investment in the expansion of the Ho Chi Minh City – Long Thanh – Dau Giay Highway is more than 9.976 billion VND.
Open more roads connecting with the Ho Chi Minh City – Long Thanh – Dau Giay highway
[ad_2]