[ad_1]
During the work, the construction machine blew the water pipe. When the water from the exploding pipe rose several meters in height, those moments were reflected in the camera of the mobile phone.
While teams from Istanbul Metropolitan Municipality and ISKI were working at Üsküdar Hakimiyeti Milli Caddesi in Istanbul, the construction machine blew the water pipe.
With the effect of the explosion, the pressurized water rose several meters.
The surrounding merchants tried to protect their stores by closing their store shutters after the initial shock passed.
The crews cut off the running water and repaired it.
“WE HAVE THE NIGHT”
Selçuk Yıldız, who was working in the workshop when the pipe burst, “We were scared when the water jumped into the air. It probably blew the main pipe. We had a nightmare for 20 minutes. Because we couldn’t see each other, disaster was looming like this in the form of a storm. At that time, the sky It was black. Even our merchants closed the shutters. Just in case, just in case. Of course, it took like fifteen or twenty minutes and then they shut off the water. The firefighters came too. The bucket operator here woke up immediately. He put the bucket down. into the water with the mouth of that bucket. Otherwise, it would be a big problem here. They threw pieces of rocks left and right together. It’s like a mess here. First we didn’t understand what was going on. Then we realized that the main pipe exploded Here yesterday, Istanbul Metropolitan Municipality and İSKİ had a job. He spoke in the form.
Water pipe explosion while working in Üsküdar VIDEO