Important change regarding the opening of schools



[ad_1]

Latest news .. The Regulation of Modification of the Regulation of the Ministry of Education on Opening, Closing and Naming of Institutions entered into force after its publication in the Official Gazette.

Consequently, if the number of students in grades 1-4 falls below 10 in total; If the transport conditions are unfavorable or the parents of the students do not want their children to receive an education within the scope of access to education by transport, regardless of the number of students, the Ministry will ensure that these primary schools remain open if the government considers it appropriate. Except for this, the institution will be closed if the total number of students falls below 10 in pre-schools and primary schools, 30 in secondary schools, imam hatip secondary schools and regional boarding secondary schools, and 40 in secondary educational institutions. .

To open an imam hatip high school and high school, it will be required to have a maximum of 32 classrooms, at least 15 or 30 5th grade students, a science class, a visual arts workshop and / or a music classroom, a technology and design workshop and a sports hall or theater.

class = “cf”>

In the process of establishing institutions in new buildings, the report of the on-site inspection carried out by the persons assigned by the governorate for the conformity of the building with the property of the proposed institution in matters of education and training, and the temporary acceptance of the Building Occupancy Permit or building construction programs at State Investment Institutions or Basic Education or inspection of the building by the governor’s technical staff. A copy of the provisional acceptance certificate provided that the temporary acceptance of the educational institutions that have been carried out or built within the protocols has been made, the process of obtaining the building license for reasons such as leaving the road that does not present risk in regarding student and building safety, adjudication, unification, plan change, supply of documentation. It will be sent to the Ministry by the government.

[ad_2]