Technology

Two sides of the new Kömürhan bridge combined

[ad_1] “Yeni Kömürhan”, which began to be built on the Karakaya Dam lake in 2014, in order to ensure the integrity of the divided highway between the Elazig-Malatya provinces, which were interrupted at the point where the old existing bridge is located , and to establish a more comfortable and …

Read More »

Two sides of the new Kömürhan bridge combined

[ad_1] The two sides of the 660-meter-long New Kömürhan Bridge, connecting the strategic roads, are combined with the assembly of the last 6-meter-long steel segment. The General Directorate of Roads of the Ministry of Transport and Infrastructure started construction on the Karakaya Dam lake in 2014 in order to ensure …

Read More »