The Prime Minister opens the Green-Gold Line, travels for the inauguration of this December 16



[ad_1]

The Prime Minister is preparing to launch Green Line train service along the route of 59 connecting stations, traveling in 3 provinces, and will attempt to travel on the Golden Line unmanned train for its inauguration on 16 December.

On December 12, 2020, Anucha Buraphachaisri, spokesperson for the Prime Minister’s Office, revealed that on December 16, General Prayut Chan-ocha, Prime Minister and Minister of Defense, will preside over the opening of the bus service. MRT Green Line Mo Chit – Saphan Mai – Khu Khot project And the project of the secondary public transport system, the Golden Line, which will link the Golden Line connecting the Green Line. From Krung Thon Buri Station To Khlong San Station To open Gold Line service Maiden voyage

The development of a continuous transit system between the Green Line and the Gold Line. Making it possible to connect people who travel to 3 provinces: Pathum Thani, Bangkok and Samut Prakan Increase travel options for citizens Include the Golden Line electric train is the first UAV system in Thailand. This will reduce pollution and save energy.

For the opening of the service of the Green Line Project MRT Mo Chit – Saphan Mai – Khu Khot, adding 7 stations, namely, Phaholyothin 59 station, Sai Yud station, Saphan Mai station, Bhumibol Adulyadej hospital station, station from the Air Force Museum, Kor Por Junction Station and Khu Khot Station, which are part of the latter. As a result, the MRT Green Line project was a success. At the opening of the service at all stations along the route of 59 stations, a total route of more than 68 kilometers, it is expected that, together with the open route, it can handle 1,500,000 passengers per day.

Image: Prime Minister's Operations Center - PMOC

Image: Prime Minister’s Operations Center – PMOC

While the Golden Line metro project It is a secondary transport project, Phase 1, with a distance of 1.8 kilometers, consisting of 3 stations: Krungthon-Charoen Nakhon-Klongsan It is an automatic guide transit system (AGT) or electric train, the Automated People Mover (APM) system predicts 42,000 passengers per day, connecting journeys via a railway wheel system, including passenger boat travel on the Chao Phraya River.

A spokesman for the Prime Minister’s Office said the development of the electric train network in Bangkok. The 14 lines and the suburbs with a distance of more than 553.41 kilometers, 9 routes are currently in service, in 2021 there will be a dark red line train service. (Bang Sue – Rangsit) Light Red Line (Bang Sue – Taling Chan), Pink Line 2022 (Khae Rai – Min Buri) Yellow Line (Ladprao – Samrong) and Dark Red Line 2023 (Rangsit University – Rangsit Campus) Red Line Smooth (Taling Chan – Salaya) and light red line. (Taling Chan – Siriraj) etc.



[ad_2]