[ad_1]
Truck parts At 4:30 p.m. on May 10, reporters reported that Route users are finding trucks, aircraft parts Park obstructions on the Vibhavadi exit road in front of the North Park entrance on the left, resulting in slow traffic congestion in the area.
Follow the news, follow the line Fresh news Get here
While there was a news report from The Royal Thai Police reported that The above mentioned plane truck is a truck of a transportation company receiving non-service aircraft using 5 trucks traveling from Don Mueang to depot in Nakhon Sawan, with a total relocation of about 5-6 days. Last
But once it was gone The truck has used the Vibhavadi Road entrance from 04.00 to return to the Suthisan crossing. Only 1 car appears to be climbing the bridge over the Lat Phrao intersection. But he assessed that height cannot pass. After that, I drove back over the bridge. Therefore, park on the side of the road in front of Horwang School, in front of Central Ladprao Mall. Penetrate excess parts
As for the other 4 cars that made a U-turn. To park at the Bang Khen intersection AND in front of the North Park entrance Covering a wide area of more than 2 lanes AND you will drive back to pick up the drilled parts at 9pm.
From the inspection of the truck, parts of the aircraft were not properly requested with the Vibhavadi Police Station in any way, but there was coordination with the Chief of Police at the Don Mueang Police Station for transportation. Said parts of the plane, that the Don Mueang Police Station did not have any documents or recognized the request in any way.
Initially, investigative officers at the Vibhavadi police station issued an order in accordance with the Traffic Law, comparing all the fines. Accused of carrying overloaded objects AND does not show the red distance indicator That the maximum fine is not more than 2,000 baht. However, Bangkok Highway has assigned the Suthisarn Expressway to report due to overweight freight transport than normal for highway law
[ad_2]