[ad_1]
The Prime Minister is preparing to open the Green Line train that connects 3 provinces; try to ride the Gold Line on December 16th.
Date Dec 12, 2020 at 2:14 PM
The Prime Minister prepares to inaugurate the Green Line electric train, completes routes 59, connecting stations in 3 provinces, ready to test the golden line for a maiden voyage on December 16.
On December 12, 20, Anucha Buraphachaisri, spokesperson for the Prime Minister’s Office, revealed that General Prayut Chan-ocha, Prime Minister and Minister of Defense will preside over the inauguration of the Mo Chit – Saphan Mai – Green Line train project. Khu Khot And the Golden Line secondary public transportation system project of the Prime Minister and the media will join the Golden Line train connecting the Green Line train from Krung Thon Buri Station to Khlong San Station. To open the service of the Golden Line The maiden voyage on Wednesday, December 16.
A spokesman for the Prime Minister’s Office said that the development of a smooth public transport system Between this green line and the golden line Making it possible to connect people who travel to 3 provinces: Pathum Thani, Bangkok and Samut Prakan Increase travel options for citizens The Golden Line electric train is Thailand’s first unmanned aerial vehicle system. It helps reduce pollution and also save energy.
In this sense, the opening of the service of the Green Line Project MRT Mo Chit – Saphan Mai – Khu Khot, adding 7 stations (Phahon Yothin 59 station, Sai Yud station, Saphan Mai station Bhumibol Adulyadej Air Force Museum Station hospital station, Kor Por Junction Station and Khu Khot Station), the last part As a result, the Green Line Metro Project Success In opening services at all stations Along the route of 59 stations, a total distance of more than 68 kilometers, it hopes that, together with the open route, it can accommodate 1,500,000 passengers a day.
While the Golden Line metro project It is a secondary public transport project, Phase 1, with a distance of 1.8 kilometers, consisting of 3 stations: Krungthon-Charoen Nakhon-Khlong San The Automated Guideway Transit (AGT) system or Automated People Mover (APM) forecasts 42,000 passengers per day, which can link rail travel, including passenger boat trip on the Chao Phraya River. As well
A spokesman for the Prime Minister’s Office said the development of the electric train network in Bangkok. And the 14 metropolitan lines, a distance of more than 553.41 kilometers, 9 routes are currently in service, and from 2021 onwards, there will be a train service open every year like 2021, including dark red (Bang Sue – Rangsit ), light red (Bang Sue – Taling Chan), 2022 pink (Khae Rai – Min Buri), yellow (Ladprao – Samrong) and 2023 scarlet (Rangsit – Thammasat University, Rangsit campus), light red (Taling Chan – Salaya ), light red (Taling Chan – Siriraj), etc.
“The government has also invested in the development of the railway system, including the electric train, the double train and the new railway line. And high-speed trains which is in the process of up to 1.5 trillion baht to become the main principle of travel and transportation of the country. Improve people’s travel in Bangkok. And different regions Be equal and equal, “said a government spokesman.
[ad_2]