‘Big Tu’ takes a car to travel ‘inauguration’ to open the train ‘green line’ that connects 3 provinces this December 16.



[ad_1]

December 12, 2020


391

The ‘Prime Minister’ prepares to open the Green Line train service along the route of 59 connecting stations. Pathum Thani – Bangkok – Samut Prakan Ready to try driverless Golden Line tour, Thailand’s first unmanned trip

On December 12, 2020, Anucha Buraphachaisri, spokesperson for the Prime Minister’s Office, revealed General Prayut Chan-o-cha, Prime Minister and Minister of Defense. He will preside over the opening of the project serviceBTS Green Line: Mo Chit – Saphan Mai – Khu Khot And a secondary public transport system project, the Golden Line By the Prime Minister and the media It will join the Gold Line connecting the Green Line train from Krung Thon Buri Station to Khlong San Station to open Gold Line service Maiden voyage on Wednesday, December 16.

With the development of a seamless transit system between the Green Line and the Gold Line Making it possible to connect people who travel to 3 provinces: Pathum Thani, Bangkok and Samut Prakan Increase travel options for citizens Including the first golden line no manned in Thailand Helps reduce pollution and also save energy.

In this regard, the opening of the service for the Green Line Metro Project, Mo Chit – Saphan Mai – Khu Khot, has added 7 stations (Phahon Yothin 59 Station, Sai Yut Station, Saphan Mai Station Bhumibol Adulyadej Air Hospital Station Force Museum Station, Kor Por Junction Station and Khu Khot Station), the last part As a result, the Green Line Metro Project Success In opening the service of all stations along the route of 59 stations, a distance total of more than 68 kilometers, it is expected that when combined with the open route, it can accommodate 1,500,000 passengers / person per day, while the Metro Golden Line Project is a secondary-size public transport project. Phase 1 consists of a 1.8 kilometer distance consisting of 3 stations: Krungthon-Charoen Nakhon-Klongsan. The Automated Guideway Transit (AGT) or Automated People Mover (APM) system forecasts 42,000 passengers per day, which can link rail wheel travel, including passenger boat trips on the Chao Phraya River. As well

A spokesman for the Prime Minister’s Office added that Development of the electric train network in Bangkok And the 14 metropolitan lines, a distance of more than 553.41 kilometers, 9 routes are currently in service, and starting next year, there will be a Train service open every year, such as 2021, including dark red (Bang Sue – Rangsit), light red (Bang Sue – Taling Chan), 2022 pink (Khae Rai – Min Buri), yellow (Ladprao – Samrong) and 2023 scarlet (Rangsit – Thammasat University, Rangsit campus) Light red (Taling Chan – Salaya) – Light red (Taling Chan – Siriraj) etc.

The government has also invested in the development of the railway system, both the electric train, the train, the railway, the new railway. And high-speed electric vehicles that have reached 1.5 trillion baht in operation to become the country’s main travel and transportation principle. Improve people travel in Bangkok. And different regions Be equal and equal“The government spokesman reiterated.

[ad_2]