[ad_1]
Lots of works, 5 contractors to create “Thai-Chinese Railway” 40 billion “ITD” took 9.8 billion cakes
November 26, 2020 should be another historic day for the Bangkok-Nakhon Ratchasima high-speed rail project or the 253 km Thai-Chinese railway owned by the Thai and Chinese governments. Total development of the project In state-to-state form The Thai side has invested in both the project and the construction of the entire project worth 179,413 million baht The Chinese side designs and supervises the construction of the railway system, the electrical system, acquires high-speed trains. Operate staff training
Today, it involves the signing of a civil works contract for a distance of 253 km, for a total of 5 contracts for 40,275.33 million baht, consisting of 1. Contract 3-2 Muak Lek-Lam Ta Khong Tunnel 12.23 km with Nawarat Pattanakarn Plc. Construction of 4,279 million baht, the work is a structural work of 12.23 km of railway, 3.27 km of ground level, 8 km tunnel, 0.96 km of elevation, 4 buildings and structures and various demolition work. Construction period 1,080 days
By Nawarat Patanakarn Public Company Limited He is an expert in the construction of large infrastructures such as roads, highways, bridges, large tunnels. Dam and pier, etc. Major works such as reservoirs and tunnels, Lam Ta Khong forestry power station, drainage tunnel under Bang Sue canal, tunnel link between Sam Yan Mitr Town shopping center and Sam Yan MRT, Bang Pa-in – Korat highway, Entrance of Cars Betong Airport Parking And Laem Chabang Port, Tha A
2. Contract for 3-3 horse ladders – Lam Takhong, 21.6 km, with Krungthon Engineering Co., Ltd. (Thai Engineer and Industry Co., Ltd.) is the construction of 9.838 million baht, the work is the 26.10 km railway structure. Work at Pak Chong Station Work at Pak Chong Station Building and construction work to support 3 works of the electric train system and various demolition works, construction time of 1,080 days.
Construction contractors have no less important works, such as the Huai Kon-Hongsa border crossing, the Lao People’s Democratic Republic, the Bang Phli-Suksawat highway, the Bang Pa-in-Korat highway, the second and fourth Mekong bridges. , Toll. Highway, Chalong Rat Highway, Prachuap Khiri Khan – Chumphon
3. Contract 3-4, Lam Takhong – Sikhiu Y Kudjik-Khok Kruat period 37.45 Km. With Italian-Thai Plc. Development It is the construction of 9,848 million baht, that this agreement is Italian-Thai Plc. Bid as the second minimum, but void the BPNP Co., Ltd. Group Who offered the lowest price to be first, but when the rating failed
The works amount to 14.12 km, elevated highway to 23.33 km, construction of 8 electric train systems and demolition, the construction period is 1,080 days.
For Italo-Thai Limited Company It is the number one contractor in Thailand In the past, there are important works like the BTS Subway Red Line Metro Bang Sue – Rangsit Green Line Metro Mo Chit – Saphan Mai – Khu Khot Extension of the Blue Line Bang Highway Pa-in-Korat Suvarnabhumi Airport Taiwan High Speed Train Map of Kabao – Union Thanon Chira Double Track Railway Hua Hin – Prachuap Khiri Khan Railway
4.Contract 3-5, Khok Kruat – Nakhon Ratchasima, 12.38 km, has a joint venture of the SPTK group to build 7.75 billion baht, the work is a 12.38 km railway structure. Nakhon Ratchasima Building and construction work to support the work of the train system AND demolition work, construction period 1,080 days
The SPTK joint venture is formed by Napa Construction Co., Ltd. It is a contractor with experience in the construction of public transportation infrastructure. Are you a contractor affiliated with Kamphaeng Phet Viwat Construction such as Roads, Bridges, Overpasses, Flood Protection Systems, Major Works like Highways, Bang Yai – Kanchanaburi Intersection Level Construction Road Construction 314-Ladkrabang
Timse Cartar SDNBHD is a Malaysian contractor. Construction of the elevated railway, highway, bridge project of state-owned enterprises and private enterprises, such as the construction of the Ampang Package A Line Extension Project and the Nilai Interchange Project
Bina Puri SDNBHD is a professional construction company. In the construction of all kinds of important works such as The Ampang Package A Line Extension Project, etc.
And 5. Contract 4-7, Saraburi – Kaeng Khoi, 12.99 km, has a construction company of 8.56 billion baht Civil Engineering Co., Ltd. Saraburi Station 1-way maintenance center, buildings and supporting structures train system work AND demolition work by Civil Society grew from a highway contractor, Bangkok Road and the Department of Roads and began to move into large projects.
Important works like Materway Bang Pa-in – Korat Construction of Bangkok Noi – Nakhon Chaisri Road Taling Chan – Phutthamonthon Sai 2: Construction of a rubber industrial estate in the southern region of Songkhla province; construction of a dam at the head of construction and construction of the Din Daeng canal Nakhon Si Thammarat Province Construction of Highway 304, Pak Kret District – Chaengwattana Government Center Construction of the Western Outer Ring Road And also get the construction of the Thai-Chinese railway Q-Kut Jik palette
[ad_2]