Brake Airport Link cuts ticket fares, ordered “Sak Siam” to find a way to cut costs before showing an additional 3-month loss of 2.7 million.



[ad_1]



Discounted fares “Sak Siam” Brake Airport Link After 3 months, an additional loss of 2.7 million baht was ordered to find a way to reduce costs and show that Motivation turned to travel at another time. Actually wait 2 weeks, if not loss, expect to start cutting back as a New Years gift. But no additional losses should be made

Transport Minister Sak Siam Chidchob revealed that after the meeting he handed over the policy to the board of directors and executives of SRT Railway Co., Ltd., an airport rail link operator that is now a group. Director (Board) of the new airport link, with Mr. Raphee Phongbuphak as president who reported on various problems Of the Airport Link that will have to take corrective actions such as limited missions There is a limit to obtaining income, which has allowed SRT and Airport Link discuss how they can be unlocked.

For measures to reduce airport link fees to help reduce people’s cost of living The Board of Directors of the State Railway of Thailand (SRT) has previously approved doing so. The Airport Link has reduced the rate. But you found that you had to suffer a loss of 30,000 baht per day or around 900,000 baht per month, so if you took steps to reduce the fee, you should not create additional loss burdens.

For example, check operating costs to see if there are points that can be reduced, in addition, assumptions must be made to reduce the rate. What does the airport link say? To diversify the passenger’s journey during peak hours, they use the service at other times. That at this time there is no statistical number that can confirm that Low fares Make more passengers use the service during peak hours Therefore, the hypothesis is to prove that passengers are distributed. And have more revenue or not Keep statistics for about 2 weeks if the number of passengers outside peak hours increases and affects the increase in revenue and the big picture. Not lost as in the past You can announce a rate reduction That can also be a New Year’s gift to the public. But if you don’t follow the assumption AND you have to bear additional losses, you shouldn’t reduce the price

“Airport Link has to test the hypothesis, collect statistics, if the price is reduced, why will the loss occur? Last October, it was discovered that the airport link had a downstream condition that caused delays in the payment of the employees. Which was surprising how it happened Both the airport link receives salaries from SRT. ”

However, on the part of the bus The Airport Link reported that the train is currently under maintenance. You will be able to use the 9 trains, which will allow you to provide services according to the normal bus schedule. And it has traffic stats that are on schedule over 99%

In addition, the President of the Airport Link Board also proposed guidelines for the operation of a joint ticketing system. It developed an inter-system card use system in the interoperability format with the Mass Rapid Transit Authority of Thailand (MRTA), which operated the Purple Line MRT, two pilot lines, which both agencies were able to discuss together. Develop a joint ticket Used throughout the system, 4 parties participate: MRTA (Purple Line), Expressway Company and Bangkok Metro Public Company Limited or BEM, SkyTrain Blue Line service provider, Bangkok Mass Transit System Public Company Limited or provider of BTS services. Green Skytrain and Airport Link Who is aware that there is still a problem with charging the system maintenance fees And writing software, which is not difficult Because it can bring the benefits that each party will receive divided into Who has benefited so much Being the bearer of the investment burden proportionally Fairer

News reports say Measures to reduce the tariff of the airport rail link Carried out previously There will be a discount. Off-peak hours (Off-peak hours) Monday through Friday at 3 hours: 5:30 a.m. M. – 7:00 a. M., 10:00 a. M. – 5:00 p. M. And from 8:00 p. M. At 12:00 p. M. For passengers with a smart pass. General Person Type (Adult Card) from the normal fare 15-45 baht to 15-25 baht, which will charge the first station 15 baht, the second station 20 baht and the third station onwards, the fare is 25 baht. It originally ended on June 30, 2020.

[ad_2]