[ad_1]
Green light cabinet drafts a decree that determines the area of expropriated land 8.722 million, cut 6 new lanes “Nakorn In-Salaya” expropriated in Bang Yai – Bang Muang – Bang Kruai – Salaya – Phutthamonthon
Ms. Ratchada Thanadirek, deputy spokesperson for the Prime Minister’s Office, revealed that on October 20, 2020, the cabinet meeting (cabinet) approved a draft Royal Decree that determines the area of land to be expropriated in the sub-district of Bang Yai, Bang Muang Sub-district, Bang Yai District Bang Khu Wiang, Plai Bang Sub-district, Sala Klang Sub-district, Bang Kruai District, Nonthaburi Province and Salaya Sub-district, Phutthamonthon District, Nakhon Pathom Province, BE. .. as proposed by the Ministry of Transport
To build Nakhon In-Salaya Road Solved the problem of traffic jams on Kanchanaphisek Road and Borommaratchachonnani Road, Comprehensive Survey of the Department of Rural Roads (NTC). It will build a new highway, 6 lanes, 12 km, with an amount of 8,722 million baht, divided into a real estate inspection fee of 29 million baht, an expropriation fee of 4,392 million baht and a construction cost of 4,301 million of baht.
“When the draft Royal Decree comes into force, NTC will start exploring this year immediately.” Mrs Ratchada said.
Starting with 1. Real estate survey in 2020, 2. Pay compensation for real estate in 2022 – 2023 and 3. Start construction in 2024 – 2026
In this sense, a public hearing of the affected person on said highway construction project was held. According to the 2005 Prime Minister’s Office of Public Hearings regulations, the results of the general public hearing had 83.8 percent of participants agree with the project.
Pathom Chalayawares, director general of the Department of Rural Roads, said that 1,370 parcels of land were expropriated along the route, most of which were agricultural areas. And buildings 87 after the Department has received the budget for the year 2021 to inspect the buildings. Expropriated in 2022, the project is a new highway, 6 lanes of traffic with 2 intersections, construction along the west-east line. And the linkage with Rama 5 Road will open a large closed area Covering an area of 90 square kilometers.
The line from the NST.5035 country road passes through Khlong Ta Phring Across the Naraphirom Canal Cut through the country road, NB5014, through the Sam Thao channel Cut through the country road, NB1001, through the China Canal , via Khun Jane The route is north of the New Life Development Center. Deviating southeast Across the Lamut Canal via country road, NB5035, near the junction with Wat Bang Muang
Then veer to the right, heading southeast. Crossing Khlong San Noi, cut off the country road, NB1001, in the Soi Inthanin area Then it started to detour to the southeast Through the open space behind the Supalai Garden Ville village Across from Bangna and Klong Prapa Before diverting to the north through the area between Manthana village and the Baan Eua Arthorn Bang Kruai project (Wat Phra Ngoen), where the route is on the south side From Wat Sunthon Thammikaram Cross the canal Y joins Kanchanaphisek Road connecting Bang Khu interchange Wiang Will pass through areas 3 districts 6 local administrative organizations 7 sub-districts 28 villages
“This road is parallel to the Nonthaburi 1 Ring Road, with the Rama V Bridge as the transport link. When it opens, it will add new networks and improve the efficiency of transportation routes. Traffic jams in Bangkok, western area Both Kanchanaphisek Road Borommaratchachonnani Road is more flexible “ Mr. Pathom said.
[ad_2]