[ad_1]
The BMA inspects the construction of phase 1 of the Golden Line Station, Krung Thon Buri Station – Khlong San District Office Station. Open for people to sit in mid-December with the rate at 3 stations, charging 15 baht.
On October 8, 2020, Pol. Maj. Gen. Asawin Kwanmuang, Governor of Bangkok, revealed after the visit of the Golden Line Secondary Public Transportation System, Phase 1, Krung Thon Buri Station – Khlong San District Office Station that the MRT Si Thong Line is a new train line that Bangkok follows the cabinet resolution. Construction began in 2018, now the construction and general installation of the system has advanced 96%, divided into 98% progress of civil works and 92% progress of bus system works. It is expected to open for service in mid-December 2020, charging a fee of 15 baht on the entire line.
The governor of BMA added that this project, Bangkok donated to Bangkok Thanakom Company Limited (KT) as operator. That it does not use the government budget But using the anticipated income from the rights of ad space on the train to invest in the construction of the project is a model of seeking cooperation with the private sector to develop Bangkok together. Therefore, the project can happen quickly, there is no need to wait for government processes and budgeting methods, and all assets of this project remain the property of the Bangkok Metropolitan Administration. I confirm that this project is a good intention that Bangkok has given to the public.
The Golden Line metro project has a total distance of 2.75 km, 4 stations along Krung Thon Buri Road, Charoen Nakhon Road and Somdej Phra Chao Taksin Road. The operation is divided into 2 phases, currently the first operation with a route of 1.80 km consisting of Krung Thon Buri Station (G1), Charoen Nakhon Station (G2) and Khlong San Station (G3)
The electric train system is either an Automatic Guided Transit System (AGT) or an Automated Guided Mass Transit System or an Automatic People Transport System (APM). The vehicle used is the Bombardier Innovia APM 300 electric car, the maximum speed at 80 km / h, 3 cars, 2 cars, capacity of 138 passengers / cabinet, the train has a width of 2.8 meters, length 12.75 meters, height. 3.5 meters, the door is 19 meters wide, and the height of the car floor is 1.1 square meters. Approximately 42,000 trips a day.
Read more …