[ad_1]
In the east of Gundeli, where the M-Park and Obi hardware store are located today, in the future there will be not only three high-rise buildings, but also a school building that will be located on the roof of the Migros building. There has never been anything like this in Switzerland.
Speakers chose the warmest words, presented the most daring designs, displayed the most beautiful visualizations. On Wednesday, representatives of Christoph–Merian Foundation (CMS), Cooperativa Migros Basel (GMB) and the Department of Construction and Transport (BVD) have announced their new plans to transform the Zone Dreispitz Nord in a new neighborhood of the city. You said that the project was an “urban masterpiece” and that the concept was simply “brilliant” (Werner Krättli, president of GMB). It has a “pioneering character” (CMS director Beat von Wartburg). And it’s not just condensed living space, but also new green spaces worrden, “exemplary” (BVD director Hans-Peter Wessels).
the Givelfinal lit is located between Münchensteiner-, Reinacher- and Dornacherstrasse, Where M-Park and Obi Hardware are located. It will completely change your face in the medium term. Become three round skyscrapers to It reaches 151 meters high in the sky. Along with seven little ones HIn this way, 800 new apartments will be built. “A considerable number of apartments will be inexpensive,” promised Hans-Peter Wessels.
Herzog & de Meuron’s writing
An artificial green hill marks the point at which the Güterstrasse will extend into the area in the future. The Migros shopping center remains in the same place as today. It will not only look different on the outside, but also on the inside – the Obi hardware store will be built in. Y – as a Swiss premiere – at the topst becomes one School for high school students mecreates. rehe had the idea Herzog architecture office & de Meuron, who is also responsible for the design of the three high-rise buildings.
While the people on the lower floors of the Migros building are in Rpoke around, become future top 600 Youthmethat hestick your nose in school books. For Director of Education Withradin Cramer High School is a perfect complement to planned primary school on Walkeweg, not far far from the tricorn North. A triple is also planned on the site.tGym.
New spaces are also being created in the city’s neighborhood. The Margaretha was created as a tribute to Christoph and Margaretha Merian and to CMS as landowner of the entire area.–Merian Plant. It will be so big will be like the Elisabethenanlage. And in memory of Migros founder Gottlieb Duttweiler and his wife Adele, the Adele will be on the roof of the Migros building.–Duttweiler-Feld invites you to stroll and linger. «Then wto write Living and living in Gundeli is even more attractive ”, the CMS promotes the new green spaces.
700 parking spaces for new cars and 4,000 for bicycles
North Dreispitz – That means not only apartments for 1,400 inhabitants, but also cafes, small shops, offices, commercial premises and a district center on Reinacherstrasse. So they not only become clients of Migros as well as tenants, rather a lot other people Go in and go out. The question arises: How does it look? Really with the parking lots?
Basically, the planning is geared towards “life in a low car,” said Lukas Faesch, Chairman of the CMS Foundation Commission. The planners’ motto is: “Give priority to slow traffic.” New bike and pedestrian trails are being created. Today existing 500 parking spaces fromin Migros and Obi will be integrated into the new Migros complex. Residents of the towers can store their cars in three parking lots, which are built above and below ground. Access is from the surrounding streets, so the area itself is car-free. The conclusion is that, in addition to today Migros parking lots around 700 additional parking lots; a total of 1200 places are available. Two-wheelers, however, break down further: 4,000 bike parking spaces are provided.
All in all the main project works completely futuristic. But everything is still paper. The next steps are the adoption of a specific development plan by the government and the Grand Council in 2021/2022. Construction will begin in 2025 at the earliest.