10 kilometers of traffic jam in front of the Gotthard tunnel



[ad_1]

At the north portal of the Gotthard road tunnel, vehicles were jammed for a length of 12 kilometers on Saturday morning. The time lost on the way south between Erstfeld and Göschenen in the canton of Uri was about two hours.

To avoid traffic congestion, TCS recommended the route on the A13 through the San Bernardino Tunnel as an alternate route south, as the traffic service wrote on its website Saturday.

Snowfall also caused traffic delays in several places in Switzerland on Saturday morning. Many roads in the mountains are covered with snow, for example in Davos and Arosa in Graubünden and in Simplon Pass in Valais.

According to SRF Meteo, so much snow rarely falls in September. In Montana VS there was even a record: 25 centimeters of snow fell there, as the weather service wrote on Twitter. 26 centimeters of snow fell on Davos. Measurements for these two places have been available since 1931, the altitude is only measured early in the morning, as they say.

School holidays started on Friday night in several cantons. (viw / sda)

No trace of traffic jam: when the St. Gotthard was still welcoming

Mobile toilets against piss on the slopes of St. Gotthard

You may also be interested in:

Blown by snow: motorcycle drivers had to abandon the machines

The start of winter on Friday caused precarious conditions on the roads of Graubünden at the higher elevations. Some motorcycle drivers were completely surprised by the arrival of winter after summer and had to leave their machines in the mountain passes.

The Flüelapass between Davos and the Lower Engadine was closed for security reasons. If you wanted to go through the steps of Julier, Albula, Bernina, Ofen, Splügen or Forcola di Livignio, you had to put the snow chains on your vehicle …

Link to article

[ad_2]