[ad_1]
Ludovic Orban stated on Saturday at a press conference held in Târgu Mureş that he conducted an assessment of the state of infrastructure projects in Mureş County.
“With regard to the Târgu Mureş – Iaşi – Ungheni Union Highway, a review of the feasibility study on the Târgu Mureş – Târgu Neamţ section, which is the most difficult section because it crosses the mountains, is being carried out. The objective is to that the government approve the technical-economic indicators until the end of this year and next year to sign the contract as soon as possible, immediately after January 1 to start the tender for the designation of the company to build this section of the highway Union, “explained the Prime Minister.
He also said that for the other two sections of Union Highway, the tender will be held for a feasibility study and a technical project.
“The other two sections are also tendered, the feasibility study, the specificity in the other two sections, Târgu Neamţ – Iaşi and Iaşi – Ungheni is that the tender will be held for the feasibility study and the technical project for the next tender be directly for execution, “said the prime minister.
He also referred to the stage of the sections on the Transylvanian highway.
“With regard to the sections on the Transilvania Expressway, the first section is the Târgu Mureş – Ungheni section for which the winner is already designated and the contract must be signed. Regarding the other two sections that are under construction, the section until Cheţani in which he is the builder of Astaldi, will be completed on July 1. As for the Cheţani – Câmpia Turzii section, things are moving much more slowly there and we will do an analysis, the physical condition is only 35% and in “Within a month, the company and the Ministry of Transport will have to make a decision. We have the ability to end the contract with this consortium or we will resume the tender procedures, “Orban explained.
He also announced that after contracting a loan from the EBRD, the Sighisoara Beltway will be introduced for financing, for which there is the technical-economic documentation and the technical project.
Orban also stated that works will begin for the railway infrastructure in the Cata – Sighisoara section.
“Regarding the railway infrastructure part, the contract was signed in the Caţa – Sighişoara section and the order to start the works will be given next week, no later than June 1, and with respect to the Sighişoara section – Therefore, the works are nearing completion and our goal is to complete and host this section by the end of this year, “the prime minister also stated.
Ludovic Orban specified that for the Târgu Mureş beltway the contract has ended and work is being done on the tender documentation, with the aim of launching the auction before June 15.
If you like this article, we hope you will join the community of readers on our Facebook page, through a Like below:
[ad_2]