[ad_1]
2019 In September, the reconstruction of one of the most important sections of Geležinio Vilko Street was completed: from the Linkmenai factory of the Technical University of Gediminas to the junction with Ukmergės Street. The other side of this street (in the direction of Ozo Street) will be fixed in the future; The renewal completion date is not yet known.
“The street is gradually being maintained and repaired, managing the most problematic places, selecting them according to the criteria applied throughout the city,” says the Municipality of Vilnius.
There is no specific date yet as it is affected by budget, weather conditions, and other factors.
In 2019, a 720-meter-long section of Geležinio Vilko Street from the Linkmenai Factory of Gediminas Technical University to the intersection with Ukmergės Street was distributed with two additional lanes. In addition, the traffic light intersection on Žalgirio street was relocated and installed again, traffic lights were rebuilt at the Ukmergės – Geležinio Vilko street intersection, new sidewalks were laid, new pedestrian crossings were installed, LED lights were installed and around 400 meters of new bicycle. and pedestrian paths were built.
You can find more information about the changes implemented at that time here.