[ad_1]
The Ministry of Energy and Water announced, in a statement to its media office, that “the fair price of the rates for private electric generators for the month of March is as follows:
882 pounds For every kilowatt hour
For meter subscribers in cities or busy meetings, or at an altitude of less than 700 meters:
– 5 Amp Capacity: 20,000 LBP. + Monthly package X 882 LBP For each kilowatt hour.
– 10 Amp Capacity: 30,000 LBP. + Monthly package X 882 LBP For each kilowatt hour.
– 15 Amp Capacity: 40,000 LBP. + Monthly package X 882 LBP For each kilowatt hour.
970 pounds For every kilowatt hour
For meter subscribers in distant towns or areas or at an altitude of more than 700 meters:
– 5 Amp Capacity: 20,000 LBP. (Fixed) + Monthly package X 970 LBP For each kilowatt hour.
– 10 Amp Capacity: 30,000 LBP. (Fixed) + Monthly package X 970 LBP For each kilowatt hour.
– 15 Amp Capacity: 40,000 LBP. (Fixed) + Monthly package X 970 LBP For each kilowatt hour.
5,000 LBP will be added. On the fixed part of the meter price for every additional 5 amps. “
The statement stated that “this rate is based on an average price of a plate of diesel fuel (20 liters) for the month of March of 25632 LBP, after taking into account all the expenses, benefits and costs of the generators in addition to a good profit margin for their owners. “
He noted that “this price was issued based on the mathematical table approved by the Ministry of Energy since 10/14/2010, and in compliance with Cabinet Resolution No. 2 issued on 12/14/2011 on the taking of the measures necessary to adjust the pricing of private generators, and based on a mechanism. ”The application of the inter-ministerial inter-ministerial (internal energy and economy) announced on 12/20/2011, which specified the responsibility of the Ministry of Energy and Water for circulate the prices of private generators based on diesel prices at the end of each month.
The ministry also announced that it “sent books to the interior and economy ministries in February 2021 with prices to do what is required according to the joint control mechanism.”
Source: National Agency