[ad_1]
The storm intensified and peaked at night with a notable drop in temperatures and snowfall, dropping to 500 meters. Torrential rains formed torrential torrents in several regions, and the water flooded crops and properties with strong winds exceeding 90 km / h.
Akkar
In Akkar, snow covered all the mountainous heights of Akkar Governorate, starting at 1,200 meters, with a significant drop in temperatures.
The director of the Snow Excavation Center in Jard Al-Qayta ‘area – Akkar Alya Khaled Deeb stated that “the excavators of the Ministry of Public Works, the Union of Municipalities of Jarad Al-Qaytaa and the municipality of Fneideq, began to work since the morning and reopened the roads of Hrar, Beit Yunus, Qurayyat, Ayitmashub, which are considered, You can pass in front of cars in both directions. “
He noted that “the thickness of the snow in the city of Fneideq reached 15 centimeters, and the bulldozers also reopened the road to Fneideq Al Qamaa, which has become passable in front of cars equipped with metal chains.” He noted that “the Wata Mishmish-Moujhain-Hermel-Al-Qawmah-Al-Shambobayat-Al-Bayt-cut-off-Bayt.”
Regarding the Civil Defense in Al-Qobayat, it announced that Al-Qobayat – Beit Jaafar – Hermel is isolated from the Makhzen district.
On the other hand, torrential rains caused torrential torrents in Bebnin – Al-Abda – Al-Arida, passing through the towns of Sheikh Zinad, Talbiba, Al-Kisa, Al-Samuniya, Al-Sammakia, Hakar Al-Dahiri, Al- Masoudiya and Tal Abbas Al-Sharqi. The Al-Kabir River and the houses overflowed and the water overflowed and the Al-Kabir River overflowed.
Irrigation canals overflowed in Al-Bared and the rest of the winter water drainage canals also flooded roads and squares in Al-Qaytaa, Al-Shaft and Al-Dreib areas, and municipalities are working to open the canals that diverted the roads to the lakes from Al-Abduh to the intersection of the city of Barqail, and the crossings of the city of Al-Jundrai with Jundrai-Kosha. In Wadi Khaled, the fields of the Buqi’a Valley were flooded with water.
In the Juma region, it snowed at an altitude of 500 meters. The Zabina Civil Defense Center stated that the road to Tasha – Fneideq was permanently closed and the Basbina – Prohibited – Radiant road remained passable up to a height of 900 meters, as the thickness of the snow increased and the traffic on these roads became limited to cars and mechanisms equipped with metal chains.
On the axis of the tower, Akkar al-Atika, the roads remained open, while the Akkar al-Atika-al-Haffah road became difficult to walk.
The region’s municipalities and civil defense centers in Basbina and Akkar al-Atika took all necessary measures to cope with the storm.
Human
The snow in the various towns and cities of Bcharre reached a height of 900 meters in the morning, and its thickness varied from two centimeters in the city of Abdin to ten centimeters in the city of Bcharre, while in Al-Arz it exceeded the medium meter. The bulldozers of the Ministry of Public Works are opening main roads, while municipalities are opening secondary roads.
The director of the Cedar Center for Snow Shoveling, Walid Kirouz, told “the National News Agency” that all roads in the district are passable for all cars, except for the Bashri-Al-Arz road to the electric elevator, which is passable. for equipped and four-wheel drive vehicles, while the Ainata-Al-Arz road is closed.
Hermel
In Hermel, the snow cut through the mountain roads, especially the Hermel-Danniyeh and Hermel-Mishmish roads, while the Hermel Qobayat road was passable with difficulty and for 4×4 vehicles equipped with metal chains.
Source: National Agency