[ad_1]
Coronavirus Campania Region, today’s newsletter, September 1. The Crisis Unit of the Region around 5 pm will announce the updated numbers of infections and new positives in Covid-19 in the last 24 hours.
CLICK HERE FOR THE NATIONAL NEWSLETTER!
Coronavirus Campania, today’s newsletter, September 1
This is today’s newsletter:
Positive of the day: 102
Buffers of the day: 5,837
Total positives: 7,168
Total swabs: 425,098
Deaths of the day: 1
Total deaths: 446
Healed for the day: 18
Total cured: 4,430 (of which 4,425 completely cured and 5 clinically cured. Patients who have become asymptomatic but are still waiting for the two consecutive swabs to prove their complete recovery are considered clinically cured).* Of which 51 travelers (19 cases from Sardinia, 32 from foreign countries)
.
De Luca signs a new ordinance The president of the Campania Region Vincenzo De Luca signed Ordinance no. 69 containing“Additional measures to prevent infections associated with travel returns abroad and from the Sardinia region” . Click here
to read the entire ordinance.
WEATHER FORECASTS – The Civil Protection of the Campania Region for today communicates possible phenomena of weather changes throughout the peninsula. Tomorrow, however, the local rains will mainly affect the north.
IN CAMPANIA, TUESDAY, SEPTEMBER 1:
Partly cloudy or temporarily cloudy skies, but little chance of precipitation. Winds will blow slightly variable with moderate local reinforcements. The sea will be almost rough. Temperatures will suffer a generalized decrease, more sensitive in the minimum values.
Mobility in Campania
– Section A3 Napoli Salerno closed between Cava de ‘Tirreni and Salerno from 9:00 p.m. tonight to 6:00 a.m. in both directions due to road works.
– Until September 25, 2020 the perimeter axis of Scampia from 02/09/2020 to 03/09/2020 temporary closure to traffic of the entrance ramp of the Circumvallazione Esterna SP1 in the direction of Melito to Naples
– Bypass of Naples, for works, section closed between Doganella and Capodimonte from 22:00 tonight until 07:00 tomorrow for works towards Pozzuoli. Recommended entrance to Pozzuoli: Capodimonte. Recommended departure coming from Capodichino: Doganella.
In the case of double payment of the toll after the early departure and subsequent return to the highway axis, it is possible, keeping the double receipts, to request a refund.
– Tangenziale di Salerno, until Thursday, December 31, 2020, for ordinary maintenance work, in the time interval between 10 p.m. and 6 a.m., road narrowings are active in occasional sections (with a maximum length of 1, 5 km) along the entire axis (from Fratte to Pontecagnano) and in both directions. The works, also related to the connecting branches of the artery, are suspended on holidays and before holidays.
[ad_2]