[ad_1]
Jakarta, CNN Indonesia –
The government has cut the number of National Strategic Projects (PSN) that from 227 to 201 through Presidential Regulation number 109 of 2020 on Amendment presidential decree number 3 of 2016 regarding the Acceleration of National Strategic Projects.
In the PSN list attached to the regulation, there are 55 new projects that were not previously included in the list. In addition, the government also added 10 programs in the Presidential Decree regarding the acceleration of the PSN.
Here are 55 new projects on the PSN list:
1. Extension of the scope of the Ngawi Kertosono-Kediri toll road
2. Adding the scope of the Depok-Antasari Turnpike
3. Adding the scope of the Solo-Yogyakarta-Kulon Progo toll road
4. Adding the scope of the Bogor Ring Road Toll Road
5. Gedebage Tasikmalaya Cilacap Toll Road
6. Semarang Port Toll Road
7. Makassar Maros Sungguminasa Takalar Toll Road
8. Access toll road to the port of Patimban
9. Construction of the Samarinda Bontang toll road
10. Port of Sanur Nusa Ceningan or Lembongan
11. Port of Likupang
12. Labuan Bajo multipurpose terminal
13. Development of Arar and existing slip ports
14. Labuan Bajo Komodo Airport
15. Development of Lombok Praya International Airport
16. Development of the Adi Sumarmo airport
17. Development of the new Nabire airport
18. Development of the Siboru Fakfak airport
19. North Bali Airport Development
20. Implementation of mass transport by rail in the Badung Buleleng region
21. Lahat Muara Enim Prabumulih Tarahan / Lampung and Prabumulih Kertapati / Palembang logistics train
22. LRT Jakarta-Kelapa Gading and Velodrome-Manggarai International Stadium
23. Elevated Inner Loop Line Jatinegara, Tanah Abang, Kemayoran
24. Obi Island Industrial Zone
25. Weda Bay Industrial Area
26. Takalar industrial area
27. Tanjung Enim Industrial Zone
28. Tamablang Dam
29. Beringin Dam, please
30. Tiu Suntuk Dam
31. Manikin Dam
32. Jlantah Dam
33. The Jragung Dam
34. Sepaku Semoi Dam
35. Budog-Budog Dam
36. Ameroro Dam
37. Development of the irrigation network of the Rentang irrigation area
38. Rehabilitation of the irrigation network of the Glapan irrigation area
39. Development of the irrigation network of the irrigation area of the Telake swamp
40. Development of the irrigation network of the Lempuing irrigation zone
41. Karian Serpong Regional Drinking Water Supply System
42. Regional drinking water supply system Kamijoro Bantul Kulonprogo
43. Kobema Fort or Bengkulu Central Bengkulu Central drinking water supply system
44.Sidan Dam Raw Water Supply System
45. Karian raw water facilities and infrastructure
46. Coastal embankment
47. Upgrading of existing factories / RDMPs and Balongan petrochemical industry
48. Development of the urban gas network
49. Construction of the Cirebon-Semarang national gas transmission pipeline, the Kek Sei section of Menke-Dumai and the sections of the Natuna-pemping transmission system
50. Coal gasification in Tanjung Enim
51. Construction of a coal-to-methanol facility in East Kutai
52. Development of green fuel (Renovation of green biological diesel refinery RUIV Cilacap, Green Refinery RUIII Plaju, Hydrogenation CPO PT Pusri Palembang, Katalis Merah Putih Pupuk Kujang Cikampek)
53. Development of male combat drones
54. Development of production technology for IVO and oil palm gasoline with red and white catalysts integrated with community gardens
55. Development of the salt industry
Meanwhile, the 10 shows added by the government and included in the PSN list include:
1. Electric infrastructure development program (the list of projects is regulated in a presidential regulation on accelerating the development of electric infrastructure)
2. Economic equality program
3. Border area expansion program
4. Exit from the toll road development program
5. National program for the development of strategic tourism areas
6. Construction program for the processing of waste into electrical energy (PSL)
7. Foundries construction program
8. Program to increase the national food supply (food park)
9. Super hub development program
10. Regional development acceleration program stipulated in a presidential regulation on accelerated regional economic development
(hrf / age)
[ad_2]