[ad_1]
JAKARTA, KOMPAS.com – The President of the Republic of Indonesia, Joko Widodo, recently inaugurated the Serpong-Cinere Highway on Thursday (1/4/2021).
This toll road is planned to become JORR (Jakarta Outer Ring Road) II, which will connect the Cinere-Jagorawi (Cijago) toll road.
Definitely on vacation long weekend this time, there have been many people who are excited to try these toll roads. Even to the point of creating a traffic jam. Even though these toll roads are not yet fully connected.
This was revealed by the president director of PT Cinere Serpong Jaya (CSJ) Ayu Widya Kiswari, as a subsidiary of PT Jasa Marga (Persero).
Also read: The Minister of Transport said that the 2021 Lebaran Homecoming Ban was strictly enforced
According to Ayu, the enthusiasm of road users for the operation of this toll road has been monitored since Friday afternoon (2/2/2021) at 10:00 p.m. WIB.
His party is also coordinating with the South Tangerang City Transportation Agency for traffic engineering and traffic light regulation there.
“We ask for patience from road users because at this time the density that occurs on the national highway connected to GT Pamulang is observed, that is, Jl. RE Martadinata has an impact on access to highways”, said Ayu, in its official statement (3/4/2021).
Also read: Yamaha M1 engine breaks down, Morbidelli is forced to use a new engine
Ayu also said that there are still quite a few road users accessing the Serpong-Cinere Expressway for the Serpong-Pamulang Section in the hope of continuing the journey to the Jagorawi Expressway via the Cinere-Jagorawi Expressway (Cijago).
“The one that was inaugurated and operated is Section 1 of the Serpong-Pamulang Section with the final trip to GT Pamulang. Meanwhile, the one that will connect to the Cijago Highway is Section 2 of the Pamulang Cinere Section, which is currently still under construction, ”said Ayu.
For road users heading to the Cijago toll road through the access to the Serpong-Cinere toll road, the Serpong-Pamulang section can exit at GT Pamulang and continue the journey on the national highway and re-enter on the GT Kukusan toll road, Cijago toll road.
Also read: Celebrities flock to buy Big Matik, what are the advantages?
“Most road users think that the Serpong-Cinere Highway is already connected to the Cijago Highway because one of the travel navigation applications has shown that the two toll roads are connected, but in fact they are not yet. “, He said. Ayu.
“As additional information, Jasa Marga is currently coordinating with related parties from the application to improve travel routes,” he said.