Index – National – The airline of the Budapest-Győr railway line broke, the delay is significant



[ad_1]

Because the airline was cut off during the storm, major delays on the Budapest-Győr line also need to be prepared, Mávinform told MTI on Saturday night. It was written: Train traffic between Győr and Öttevény is interrupted, because on one track the overhead line was also cut in one section, on the other track there were tree branches on the overhead line.

During the storm, a tree fell on the train track, so train traffic between Dunakeszi and Göd, as well as Vácrátót and Vác, is suspended, Mávinform reported Saturday night. MÁV-Start ordered replacement buses to transport passengers. Delays must be prepared on the Budapest-Vác-Szob and Budapest-Veresegyház-Vác lines, he added.

Later it was announced that the rail traffic between Vácrátó and Vác could be restarted from 20:15. At the same time, between Galgamácsa and the Acsa-Erdőkürt station, a tree fell on the rails in front of a train. There is a track lock between the two stations. The passenger train returned to the Galgamacha station.



[ad_2]