[ad_1]
A government resolution on improving the accessibility of the Central Hospital of the South Hospital (DBC) was published in the Hungarian Gazette. The planned location of the Super Hospital will not change, so the facility will be located in the XI. It will be built in the district of Dobogó. The investment value is three hundred billion HUF. This amount also includes the purchase of medical equipment, but the development of transportation infrastructure is no longer, that is, the investments listed in our article involve additional costs.
In any case, it is a fact that congestion in the area, that is, in the introductory section of the M1 – M7 motorway in the capital, is already regular during peak periods, and with the continuous integration of the South Buda region , the traffic load will only increase further, that is, efficient and large-scale transportation. transformation.
New bridge, new crossing, new roads
It appears from the Gazette that the government agrees with the preparation of the following infrastructure developments necessary to access the Super Hospital in order to meet the quality of transportation corresponding to the importance and capacity of the new health facility:
- Reconstruction of the section of the M1 – M7 motorways in Dobogó út between the introductory section of the capital and Balatoni út to ensure direct access to the DBC.
- Construction of a new road junction at the Dobogó út – Őrmezei út – Balatoni út junction, including road construction and technical traffic corrections necessary for the connection of the junction on the Balatoni út section between Menyecske utca and Egérút.
- Construction of a new independent-level urban junction in the introductory section of the capital of the M1 – M7 motorways – Gazdagréti út – Budaörsi út – Dobogó út node.
The preparation of the mentioned investments is carried out by the Budapest Development Center, under the direction of Dávid Vitézy and Balázs Fürjes.
They also think about public transport
BFK is also preparing a feasibility study on the construction of the tram infrastructure necessary to prepare for the implementation of the őrmező bus terminal at the Kelenföld intermodal crossing.
The area is now covered in bushes.
In the designated area of the Super Hospital, between the introductory section of the M1 – M7 motorway and the Mouse Road intersection, there is currently an area covered with grass, bushes and shrubs. This is where one of the most expensive investments in the Healthy Budapest Program takes place.
Laying of the first stone in two years
After preparation, the investment of the South Buda Central Hospital is expected to begin in the spring of 2022, with the laying of the first stone, and the delivery of the institution is expected in five years, in early 2026.
[ad_2]