[ad_1]
The streets and squares of Cairo not only received the attention of political leaders, as President Sisi always led the development of the Corniche del Nile to the latest international levels within a comprehensive project to restore the beauty and splendor of El Cairo.
The People of Egypt Walkway project was the nucleus for the development of an outlet for the inhabitants of the capital and neighboring governorates within the integrated plan to develop the landmarks of the Cairo Governorate, until the designs and the final shape appeared that they dazzled all who saw it, believing that the scene was from the heart of Europe.
The project will turn the Corniche into a masterpiece of aesthetics and a park for all Egyptians and tourists on the longest and oldest river in the world, the Nile River. Its first phase began in the region between the 15th of May Bridge and the Bridge Imbaba.
The development plan included a single stepped walkway along the Corniche with a length of 4.7 km, the average width of the upper walkway is 4.5 m, while the average width of the lower walkway is 6, 5m. The project also included 19 buildings, including 5 restaurants, 5 cafeterias and 62 A shop, 3 garages with a total capacity of 180 cars, as well as 3 runways with a total length of 315 m, with capacity for 1240 people, in addition to a 275 square meter theater with capacity for 772 people.
The first phase of the project was developed in a 1.8 km section that starts from the May 15 bridge and ends at the Imbaba bridge, while the second phase, which is being built, starts from the Qasr al-Nil bridge and ends in the May 15 bridge, and also includes the distance from the Imbaba Bridge to the Sahel Bridge with a length of 2.9 km. meter.
A source from the Cairo governorate confirmed that the project will cost around £ 585 million, indicating that the first phase will be completed soon.
He explained that a security company and a cleaning company will be assigned to maintain the safety of citizens and keep the walkway clean on a continuous basis.
As for the Ministry of Housing, it confirmed that the People of Egypt Walkway project is one of the most important recently implemented projects that contribute to improving the quality of life of citizens, increasing green spaces and employing 4,000 workers, all of them citizens Egyptians, in addition to indirect employment.
The ministry revealed that the project will have about 235 trees and 62 palm trees, and there will be stores that will sell everything, and there will be 19 buildings. It is true that the first phase M has been completed, with a completion rate of 95% Opening in two months.
[ad_2]